What your report shows

Maximum demand on each phase

Your real peak load, measured at the main switchboard.

When the peaks happen

Daily peaks, startup surges and what is likely driving them.

Spare capacity

How much headroom you have on your existing supply.

Upgrade sizing

Whether an upgrade is needed, and what size. Measured demand is often lower than a calculated estimate.

Power quality investigations

Nuisance tripping, voltage issues and equipment that keeps failing.

Ausgrid applications

Reports that support connection applications and upgrade decisions.

How it works

  1. 01We install a power logger at your main switchboard
  2. 02It records your real electrical demand over a set period, usually a week or more
  3. 03You get a plain-English report: peaks, spare capacity, and whether an upgrade is needed

Who it's for

Strata buildings, shops and commercial sites, EV charger and solar projects, new tenancies and fit-outs, and homes planning a three-phase upgrade.

Four power loggers clamped to cables inside an open industrial switchboard
Power loggers installed at a main switchboard

Case studies

Real results from real reports. Client names, addresses and site identifiers removed.

Commercial food production kitchen · 2 weeks of logging, 5-second intervals

Why does a submain keep tripping?

The problem

A site running 63 A ovens and multiple mixers had a submain tripping frequently, on a supply limited to 200 A.

What we did

One logger on the main switch for a week, then two loggers on both 160 A submains side by side for a second week.

85%
of the 200 A supply used at peak demand
67
times one submain went over its 160 A setting
187 A
highest sustained load on that board
25–30 A
per phase recommended to move between boards

What the data showed

  • One board was heavily unbalanced towards B phase, with neutral current up to 93 A.
  • The other board only spiked during mixer start-up and had plenty of headroom.
  • The main supply went over 200 A every day, so no more load should be added.

Outcome

Rebalance and transfer load to the lighter board rather than upgrading, then re-log to confirm.

Commercial printing press · 58 days of continuous logging

Is the supply killing the equipment?

The problem

The manufacturer of the UV curing power supplies blamed the site supply for a high failure rate.

What we did

A Fluke 1736 at the machine distribution board, with results checked against Australian voltage, harmonic and unbalance limits.

58 days
logged with no gaps
5
voltage sags captured
5.0%
max voltage distortion (limit 8%)
82 kW
maximum load recorded

What the data showed

  • Voltage, unbalance, harmonics and frequency all complied for the full period.
  • One sag during production dropped two phases to about 51–59% and tripped the machine.
  • About 30 load-switching events a day caused small, repeated 3–4% dips.

Outcome

The supply itself was within limits. Next step: match failure dates against the recorded sag events.

Need power while the supply is off?

We can supply an emergency generator to keep you powered during electrical works or while repairs happen. We assess the load and connect the supply safely.

Emergency generator hire

Northern Beaches and North Shore

Northern Beaches

Manly, Dee Why, Curl Curl, Freshwater, Queenscliff, Collaroy, Narrabeen, Mona Vale, Newport, Avalon, Balgowlah, Brookvale, Narraweena, Cromer and surrounding suburbs.

North Shore

Mosman, Neutral Bay, Cremorne, Cammeray, North Sydney, Crows Nest, St Leonards, Chatswood, Artarmon, Willoughby, Lane Cove, Northbridge and surrounding suburbs.

Common questions

Planning an EV charger or supply upgrade? Get the data first.

Request a quote

Tell us what you need. Matt or Nick will be in touch.

Free quotesNo surprise fees
Request a quote online